How we work
PHASE 1 –
Concept & Pre-design
– Produce a detailed client brief
– Site survey
– Preliminary furniture floor plan
– Initial concept / mood presentation for overall style & key areas
PHASE 2 –
Schematic Design
– Preliminary finishes & fixtures budget
– Finalised CAD floor plan & furniture layout
– Sketch visualisations presentation of key areas
PHASE 3 –
Design Development
– Finish / Fittings presentation included in the sample board
– Furnishings / FF&E presentation (Furniture, Fabrics & Equipment)
– Drawing Package for construction
PHASE 4 –
Specification & Detailing
– Issue to the contractor, all design specification schedules i.e. paint / wallpaper
– Prepare & submit FF&E proposal
PHASE 5 –
Contract Admin & Procurement
– Manage orders & deliveries for FF&E
– Respond to any queries during install
PHASE 6 –
Project Completion & Installation
– Oversee FF&E installation
– Produce snag list
– Final inspection